Skip to main content
North RidgeTransportation Authority, home

Construction notice: Harlan Avenue (Route 17) Lane Closures: Norfolk Street to Cedar Road. Closure details: Harlan Avenue (Route 17) Lane Closures: Norfolk Street to Cedar Road

Capital project NRTA-C-0142Design

North Ridge Mobility Hub

A regional transit center at Ridgeview Union Station connecting bus, intercity coach, bike share, and on-demand services in one accessible facility.
Current phase
Design
Expected completion
2029
Estimated cost
$48.6 million
Jurisdictions
City of Ridgeview

Current phase

  1. Planning (complete)
  2. Environmental Review (complete)
  3. Design (current phase)
  4. Procurement (not started)
  5. Construction (not started)
  6. Completed (not started)

Purpose and need

Replace an on-street transfer area that lacks shelter and accessible boarding space with a single facility where riders can transfer between regional services without crossing a four-lane street.

Project overview

Ridgeview Union Station is the busiest transfer point in the region, serving nine Ridge Transit routes, two intercity coach operators, and the Ridgeview Downtown Circulator. The existing on-street transfer area lacks shelter, has limited accessible boarding space, and requires riders to cross Commerce Street to change routes.

Proposed improvements

  • Twelve accessible bus bays with level boarding and real-time arrival displays
  • An enclosed, climate-controlled waiting area with public restrooms
  • A 60-dock bike share station and secure bicycle parking for 120 bicycles
  • Dedicated curb space for paratransit, on-demand transit, and passenger pick-up
  • Pedestrian crossing improvements on Commerce Street and 3rd Avenue

Environmental review

An Environmental Assessment has been prepared in coordination with the Federal Transit Administration. The document is available for public review through October 1, 2026, and a public open house will be held on September 29, 2026.

Project updates

  • Environmental Assessment available for public review

    The Environmental Assessment is available for a 30-day review period ending October 1, 2026. Printed copies are available at the NRTA office and the Ridgeview Central Library.

  • State grant agreement approved

    The Board authorized execution of a $9.5 million State Multimodal Transportation Grant agreement.

Public involvement

  • Upcoming

    Environmental Assessment comment deadline

    Written comments on the Environmental Assessment are accepted through October 1, 2026.

  • Upcoming

    Environmental Assessment open house

    Ridgeview Union Station, Great Hall, 4:00 to 7:00 p.m. A court reporter will record verbal comments.

  • Site alternatives workshop

    Riders and downtown businesses compared three candidate sites. Union Station was the preferred location.

Timeline and milestones

  1. Site selection and concept design, complete

    2023

  2. Board authorization for environmental review, complete

    March 2024

  3. Environmental Assessment public review, in progress

    September–October 2026

  4. Final design, upcoming

    2027

  5. Construction, upcoming

    2028–2029

Funding

Funding sources for North Ridge Mobility Hub
SourceAmount
FTA Bus and Bus Facilities ProgramFederal$18,200,000
State Multimodal Transportation GrantState$9,500,000
Regional Transportation Improvement FundLocal$14,400,000
City of RidgeviewLocal$6,500,000
Total project cost$48,600,000

Documents

Related plans and studies